1 |
Vickers Hoskins (M) Sdn Bhd |
Erection of 6 tons/hr boiler and accessories at Panglima Power Station |
March, 2002 |
2 |
Vickers Hoskins (M) Sdn Bhd |
Installation of 4 units of 40000 kg/hr packaged water tube boiler, and 2 units of 1000kg/hr HRSG at Putra Jaya Precint 2 |
December, 2002 |
3 |
Tritherm (M) Sdn Bhd |
Design, supply and install two units of hot water boiler. |
February, 2003 |
4 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 40000 kg/hr boiler at Kahang Palm Oil Mill, Johor. Supply of reciprocating grate (air cooled) |
2003/2004 |
5 |
Vickers Hoskins (M) Sdn Bhd |
Complete dismantling and retubing of one unit 25000 kg/hr water tube boiler at Ulu Bernam POM, Perak. |
2003 |
6 |
Vickers Hoskins (M) Sdn Bhd |
Dismantling and retubing of one unit 25000 kg/hr water tube boiler at Muar POM, Johor. |
2004 |
7 |
Vickers Hoskins (M) Sdn Bhd |
Design. Fabricate and Install one unit of biomass fuel storage and conveying system. Size: 4 x 2.5 x 8m |
2004 |
8 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 52000 kg/hr water tube boiler at Masai Palm Oil Mill, Johor.
Supply of reciprocating grate (air cooled) |
2004 |
9 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 10000 kg/hr rice-husk water tube boiler at Sin Chip Huat, Perak .
Supply of reciprocating grate (air cooled) |
2004 |
10 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 25000 kg/hr water tube boiler at Benta Palm Oil Mill, Perak |
2005 |
11 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 50000 kg/hr water tube boiler at Sedenak Palm Oil Mill, Johor
Supply of reciprocating grate (air cooled) |
2005 |
12 |
Vickers Hoskins (M) Sdn Bhd |
Installation of one unit 25000 kg/hr water tube boiler at Tai Tak Palm Oil Mill, Johor Supply of reciprocating grate (water cooled) |
2005 |
13 |
American Air Filter |
Removal of existing ESP and replace with new Bag Filter, Scope included the fabrication of structural parts and installation |
2005 |
14 |
Petra Boilers |
Fabrication of combustor, Thermal Oil Economizer, Hot Water Economizer and flue gas ducting and damper |
2005 |
15 |
Petra Boilers |
Shop fabrication of boiler pressure parts |
2005/06 |
16 |
Vickers Hoskins (M) Sdn Bhd |
Design. Fabricate and Install two units of biomass fuel storage and conveying system. Size: 4 x 4 x 11m in Indonesia |
2005/6 |
17 |
Bio Fuel Asia Sdn Bhd |
Design. Fabricate and Install four units of biomass fuel storage and conveying system. Size: 4 x 4 x 11m |
2006 |
18 |
PT Multimas Nabati Asahan |
Design. Fabricate and Install one unit of biomass fuel storage and conveying system. Size: 4 x 4 x 8m |
2006 |
19 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of economizer. Capacity: 1100kW |
2006 |
20 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of air heater. Capacity: 1400kW |
2006 |
21 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of reciprocating firing grate for 35,000 kg/hr biomass boiler |
2006 |
22 |
GA Expertise, USA |
Design and Fabricate one unit of economizer. Capacity: 700kW |
2006 |
23 |
GA Expertise, USA |
Design and Fabricate one unit of air heater. Capacity: 900kW |
2006 |
24 |
Sime Plantations Berhad |
Design. Fabricate and Install eight units of biomass fuel storage and conveying system. Size: 5x 4 x 12m |
2006 |
25 |
United Plantations Berhad |
Design. Fabricate and Install one unit of biomass fuel storage and conveying system. Size: 5x 4 x 12m |
2006 |
26 |
PT PalmIndo, Medan Indonesia |
Design. Fabricate and Install one unit of biomass fuel storage and conveying system. Size: 5x 4 x 12m |
2006 |
27 |
Szetech Engineering Sdn Bhd |
Design. Fabricate and Install three units of biomass fuel storage system.
Size: 3.5 x 4 x 11m |
2006 |
28 |
PT Boustead Maxitherm, Indonesia |
Design. Fabricate and Install one unit of biomass fuel storage system.
Size: 5x 4 x 12m |
2006 |
29 |
Petra Boilers Sdn Bhd |
Design and Fabricate two units of reciprocating firing grate for 45,000 kg/hr biomass boiler |
2006 |
30 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of economiser for 45,000 kg/hr biomass boiler |
2006 |
31 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of airheater for 45,000 kg/hr biomass boiler |
2006 |
32 |
Petra Boilers Sdn Bhd |
Design and Fabricate one unit of airheater for 16,000 kg/hr biomass boiler |
2006 |
33 |
Malaysian Workshop Engineering |
Design. Fabricate and Install one unit of biomass fuel storage system.
Size: 3.5x 4 x 10m |
2007 |
34 |
PT Incasi Raya, Indonesia |
Design. Fabricate and Install two units of biomass fuel storage system.
Size: 4x 4 x 11m |
2007 |
35 |
Recycle Energy Sdn Bhd |
Design and fabricate complete RDF storage and conveying system for 55,000 kg/hr power boiler.
Two units of fuel storage system of 5 x 24 x 7m |